  • 实验室屋顶装潢有哪些care事项?
    来源: 浏览:次 发布日期:2019-09-02
      实验室屋顶一贯会使用点缀吊顶板,质料决定需要美观大方,颜色色调,符合策划要旨,坚实可靠,吾们铝扣板吊顶, 诸如,方便您更好的了解实验室的屋顶点缀的要旨,决定铝扣板天花吊顶的主要原因是操作easy,维修方便,可方便地拆下钢板进行更换和维修。
      Laboratory roofs usually use decorative ceiling, material selection needs to be beautiful and generous, color tone, in line with the design requirements, solid and reliable, our aluminium fastener ceiling, for example, to facilitate you to better understand the requirements of laboratory roof decoration, the main reason for choosing aluminium fastener ceiling is simple operation, easy maintenance, easy removal. The steel plate is replaced and repaired.
      实验室装潢上的准备work
      Preparations for laboratory roof decoration
      (1)在天花板上安装各种管道和设备,细目灯器、通风口和各种照明朝向的地位。
      (1) Install various pipes and equipment on the ceiling to determine the orientation of lamps, vents and various lighting.
      (2)安装顶棚干襄上,应先完成墙面及地上湿法正式动土。
      (2) Before installing roof cover, wet construction of wall and ground should be completed.
      (3)搭建屋面正式动土平台框架。
      (3) Build the frame of roof construction platform.
      (4)轻钢框架天花大面积正式动土上,应制作样板房,对天花拱度、灯槽、通风口等部位进行结构处理,经鉴定下进行大面积正式动土。
      (4) Before large-scale construction of light steel frame ceiling, a model room should be made to deal with the structure of ceiling arch, lamp groove, ventilation outlet and other parts. After identification, large-scale construction should be carried out.
      铝扣板天花板图片
      Photo of Aluminum Button Ceiling
      实验室顶棚装潢正式动土手工制作
      Construction technology of laboratory roof decoration
      底子弹簧线→安装吊杆→主龙股喜装→侧龙股喜装→二次龙股喜装→铝扣板安装→清洗完毕→分项验收。
      Foundation spring line installation suspender main keel installation side keel installation secondary keel installation Aluminum fastener installation cleaning completion sub-item acceptance.
      实验室屋顶装潢正式动土细节
      Construction details of laboratory roof decoration
      (1)弹跳线:按照楼宇标高标高线,按策划标高,将吊顶标高线绕墙弹跳,找出客厅主题点,在墙上以客厅主题点为主题画龙骨级配地位线。
      (1) Bulletline: According to the floor elevation line, according to the design elevation, the ceiling elevation line bounces around the wall to find the center of the room and draw keel gradation line on the wall with the center of the room.
    实验室装潢
      (2)主龙骨吊杆安装:细目吊杆下端标高,在吊杆触及天花板标高线和龙骨地位线下,安装预制吊杆,吊杆安装用8个膨胀螺栓固定在屋顶上。井架选用8圆钢,吊杆间距把握在1200mm以内。
      (2) Installation of main keel hanger: Determine the lower end elevation of the hanger. After the hanger touches the ceiling elevation line and keel position line, the prefabricated hanger is installed. The installation of the hanger is fixed on the roof with eight expansion bolts. The derrick is made of 8 round steel, and the spacing of suspenders is controlled within 1200 mm.
      (3)安装主龙骨:主龙骨一般选用C38轻钢龙骨,间距把握在1200mm以内。安装时用主龙骨支撑部件与吊杆连接。
      (3) Installation of main keel: C38 light steel keel is generally selected as the main keel, and the spacing is controlled within 1200 mm. The main keel supporting part is connected with the hanger rod during installation.
      (4)侧龙股喜装:用水泥钉将25×25mm的龙股洗客厅净高要旨绕墙固定,水泥钉间距不得大于300mm。
      (4) Side keel installation: 25 x 25 mm keel is fixed around the wall according to the room net height requirement with cement nails, and the distance between cement nails shall not be greater than 300 mm.
      (5)二次龙股喜装:按照铝扣板的规格尺寸,安装与之配套的二次龙骨,通过悬挂将二次龙骨挂在主龙骨上。下龙骨长度需要多根延续收纳时,用下龙骨连接件挂在吊顶的再是,将对端相连接,先调整直下固定。
      (5) Secondary keel installation: According to the specifications and sizes of the aluminium clasp plate, the secondary keel matched with it is installed, and the secondary keel is hung on the main keel by suspension. When the length of the lower keel needs more than one continuous collection, the lower keel connector is used to hang on the ceiling, while the end is connected, first adjusting the straight and then fixing.
      (6)金属板安装:铝扣板安装时,在装配区域中部垂直于二次龙骨方向拉基准线,并对基准线进行对齐,使基准线安装在两侧。安装时,取放轻,必须沿翻边处轻轻按方板两侧,卡入龙骨下再推合。
      (6) Metal plate installation: Aluminum clasp plate installation, in the middle of the assembly area perpendicular to the secondary keel direction pull the datum line, and align the datum line, so that the datum line is installed on both sides. When installing, take and release the light, you must press the sides of the square plate along the flanging place gently, clip into the keel and push it back.
      (7)清洗:铝扣板安装完毕下,用抹布将板彻底擦拭干净,无尽数污垢或指纹。
      (7) Cleaning: After the installation of the aluminum button plate, wipe the plate thoroughly with a rag, without any dirt or fingerprints.
      (8)铝扣板吊顶允许偏差及检验方法
      (8) Allowable deviation and inspection method of aluminium fastener ceiling