  • 实验室装潢水电work流程
    来源: 浏览:次 发布日期:2017-11-17
    1、实验室装潢水、电管路由土建方通过预埋管铺设在地皮下面,引到中央台指定地位;对于边台,水、电管路由土建方埋设在墙里引到指定地位。
    1, the laboratory decoration water, pipe route of civil engineering through the buried pipe laying under the floor, led to the central station designated position; for the side table, water, pipe routing, civil engineering buried in the wall, lead to the designated location.
    2、实验室装潢承包商从土建方留下的接入点开始安装和连接各种电缆、管路、预埋管、插座、龙头。在相关的图上标示一切的龙头、插座、效劳柱等始末。
    2. The laboratory decoration contractor starts installing and connecting all kinds of cables, pipes, pipes, sockets and taps from the access points left by the civil engineering contractor. Mark all the taps, sockets, service columns, etc. on the relevant drawings.
    9159金沙游戏场
    3、电缆和水管要有相关证明其可靠性。
    3, the cable and the water pipe must be related to prove its reliability.
    4、实验室装潢一切的开关和插座都需安装在通风柜外部。
    4, laboratory decoration, all switches and sockets need to be installed outside the fume hood.
    5、把握箱中一切空气断路器都有标示其所联的开关和插座。
    5. All air circuit breakers in the control box are marked with the switches and sockets connected to them.
    6、安装过程要符合区域法规,一切电器的安装和检验都要满足设定的要旨并记录。这些记录文档将交付终用户。
    6, the installation process should comply with local regulations, installation and inspection of all electrical equipment should meet the set requirements and record. These records will be delivered to the end user.
    7、一切电源、电器离水槽、紧急冲洗装置等有一定的安全跨距。
    7. All power and electrical appliances have a safe distance from the water tank and emergency flushing device.
    吾们一直来都争取为衣食父母供给更完美的效劳,有广大衣食父母的信任与支持,吾们才会做得更好,走的更远,为衣食父母们送去理想的产品,期待与您携手共创美好明朝!
    We have been trying to provide customers with more perfect service, with the trust and support of our customers, we will do better, go further, for customers to send the ideal product, look forward to working with you to join hands in creating a better future!