  • 净化工程质料推销应该care哪些?
    来源: 浏览:次 发布日期:2020-05-29
    1 一切质料、设备的选用、细目,必须符合净化工程策划要旨并经现场代表人员认可。
    1. The selection and determination of all materials and equipment must meet the design requirements of purification engineering and be approved by the site representative.
    2 对于有甲方指定供货商供给的质料,由正式动土员先提出质料狡猾,交porject经理部汇总审核下定货。质料运到现场下,由porject经理部质料责任师和物资部门人员验收,无产品合格证、质料不合格的产品不予接受,由porject经理部书面通知冤大头。严防不合格的质料用到净化工程上。
    2 for the materials provided by the supplier designated by Party A, the construction personnel shall first put forward the material cunning and submit it to the project management department for summary and review before ordering. After the materials are transported to the site, they shall be accepted by the quality responsible engineer of the project management department and the personnel of the material department. The products without the product certificate and unqualified quality shall not be accepted, and the project management department shall notify the owner in writing. Strictly prevent unqualified materials from being used in purification engineering.
    3 由我司供货的质料,坚持保质保量配套及时、经济适用的原则,在已通过集团官网评定的合格供货单位中决定供应商。决定好供货商下,先供给产品样本给冤大头和监理单位,供给产品合格证、检验证书,征得冤大头同意下方可订货。
    无菌室装潢
    3 for the materials supplied by our company, adhere to the principle of quality and quantity guarantee, timely, economic and applicable, and select suppliers from the qualified suppliers that have passed the company's evaluation. After the selection of suppliers, first provide product samples to the owner and the supervision unit, provide product qualification certificate and inspection certificate, and order with the consent of the owner.
    4 集团官网对供货商的评定按QG/YAⅡ-02-99-06.1-B2《物资推销work程序》要旨进行:按照所需求推销的质料的类别、要紧性和数量,决定一种或数种,品评供货商的生产能力和管理水平、质料保证体系、产品在本集团官网或其他单位的使用成果,特殊或新型产品的质料保证能力,质料状况等,评定合格下列入集团官网的供货单位名单,定定期进行复评,合格下,供需购买有关质料时进行决定。对于发生有严重质料小case影响净化工程质料;供给的产品材质证明书、合格证书与实物不符;不满足使用功能;产品外观尺寸、几何尺寸不符合使用或不合格的供货商,从供货商目录中除名。
    Four The company shall evaluate the suppliers according to the requirements of QG / ya Ⅱ - 02-99-06.1-b2 working procedure for material procurement: select one or more materials according to the type, importance and quantity of materials to be purchased, evaluate the production capacity and management level of suppliers, quality assurance system, the use effect of products in the company or other units, and the quality assurance capacity of special or new products, Quality status, etc. shall be included in the list of suppliers of the company after passing the evaluation, and shall be re evaluated regularly. After passing the evaluation, relevant materials shall be selected when purchasing by supply and demand. Suppliers with serious quality problems affecting the quality of purification project, provided product material certificates and conformity certificates that are not in conformity with the real object, which are not in conformity with the use function, whose appearance dimensions and geometric dimensions are not in conformity with the use or unqualified shall be removed from the list of suppliers.
    5 净化工程质料到货下,有检验人员按照有关准则对质料的材质说明书、外观质料、数量进行检验。对材质证明书有疑问或缺项者,还须取样到集团官网试验站进行复验,复验合格下方可入库。验证合格下,有关部门质料证明文件交现场资料员汇总存档,凡资料不齐全和检验不合格的质料,一律不准进入现场。
    5 after the arrival of purification engineering materials, there are inspectors to inspect the material specification, appearance quality and quantity of materials according to relevant standards. In case of any doubt or lack of items in the material certificate, samples shall be taken to the company's central test station for re inspection, and only after the re inspection is qualified can they be put into storage. After the verification is qualified, the quality certificates of relevant departments shall be submitted to the site documenter for summary and filing. All materials with incomplete data and unqualified inspection shall not be allowed to enter the site.
    6 无论是净化工程建造单位灰子 钦蕉恋ノ还郝虻闹柿稀⑸璞福胂殖∠戮肷柚迷谙殖〉闹柿峡夥亢蜕璞缚夥浚⑼ㄖ滴窈图嗬砑殴偻挠泄夭棵湃嗽钡娇夥拷谐醮窝槭眨稍┐笸反砘蚣嗬砬ヽare见下入库,妥善保管。做好设备、器材开箱记录,及时收集出厂 技术实现 资料、产品合格证等。
    6 the materials and equipment purchased by the construction unit or the construction unit of the purification project will enter the material warehouse and equipment warehouse set on the site after entering the site, and the relevant department personnel of the business and supervision company will be informed to the warehouse for initial acceptance. The materials and equipment will be warehoused after being signed by the owner's representative or the supervision manager and properly kept. Record the unpacking of equipment and equipment, and collect the technical data and product certificate in time.